Orangetheory Fitness

LOCATED:  Northern California

SQUARE FOOTAGE:  Each Average 3,000+ SF

PROJECT TYPE:  Tenant Improvement

PROJECT VALUE:  Varies $300,000 – $500,000

Orangetheory Fitness studios are Tenant Improvement buildout projects that are constructed within existing building shell real-estate structures that the client either purchases or leases.

The projects consist of approx. 3,200sqft. – 4,600sqft. of overall space, per studio, that requires both owner supplied equipment as well as a full buildout consisting of framing, insulation, drywall, painting, ceilings, flooring, Mechanical, Plumbing and Electrical systems install.  The projects take between 9 weeks – 12 weeks to complete.  The buildout duration all depends on the existing shell structures complexity and the extent of audio sound control requirements that are needed.  Each Orangetheory Fitness studio is designed for high impact interval trainings with audio & visual systems as key elements to communicate with to the members during the 50min. training sessions. This is why sound/ audio vibration control is essential in a successful studio buildout.